Regulation (EU) 2023/1230 applies from 20 January 2027 — no grandfathering for new placements Get your file ready →
Pilot slot

Regulation (EU) 2023/1230 · Machinery Regulation

On 20 January 2027 your technical file goes stale. There is no grandfathering.

The new Machinery Regulation replaces Directive 2006/42/EC with a hard cutover: new cybersecurity requirements for safety software, new rules for digital instructions, third-party assessment for AI safety functions, and a declaration of conformity that must be rewritten — not restamped. This catches EU manufacturers and UK/non-EU exporters alike.

✓ Pathway verdict per machine, reasoning shown ✓ No cookies, no tracking ✓ Honest limits, stated up front

What the pack covers

Regulation (EU) 2023/1230 · Machinery RegulationArticle 25 pathway reasoningAnnex I Part A / Part B splitDigital instructionsCorpus version on every pageRegenerated free for 12 monthsPrice on the page, no discovery callHonest limits stated up frontRegulation (EU) 2023/1230 · Machinery RegulationArticle 25 pathway reasoningAnnex I Part A / Part B splitDigital instructionsCorpus version on every pageRegenerated free for 12 monthsPrice on the page, no discovery callHonest limits stated up front

The delta

What actually changed — the delta that catches people

Exactly what moved from 2006/42/EC, item by item with legal bases, so the rework is scoped in hours instead of discovered in an audit.

Cybersecurity is now a safety requirement

Safety-related software must be protected against corruption — a requirement that did not exist in 2006/42/EC. Evidence belongs in the file.

Newin the Regulation

No grandfathering

A 2006/42/EC file does not carry over for machines placed on the market after 20 Jan 2027. The DoC must cite the new Regulation.

Hardcutover

AI safety functions → notified body

Self-evolving safety functions land in Annex I Part A: third-party assessment is mandatory, harmonised standards alone don't exempt you.

Annex I Athird party

Digital instructions, with a catch

Manuals may go digital — but only with lifetime accessibility and free paper on request at purchase.

Allowedconditions apply

What arrives

Not a template folder. A pack built from your answers.

Every line in the panel is a deliverable named on this page. The animation shows the assembly order; your questionnaire answers replace the sample.

MachineryReady · pack assemblysample
  • Cybersecurity is now a safety requirementNew
  • No grandfatheringHard
  • AI safety functions → notified bodyAnnex I A
  • Digital instructions, with a catchAllowed
0%
Dated · versioned · ready

Illustration of the assembly order — the delivered pack is generated from your own answers.

What the pack contains

Specific to your machines

The part that eats your engineers' month: knowing exactly what the new Regulation wants from your machines, before January.

1

Pathway verdict per machine

Self-assessment or notified body, machine by machine, with the Article 25 reasoning written out so your engineer can challenge it against the Regulation — not against our software.

2

Annex IV file skeleton + delta report

The complete technical-file structure with the new requirements built in — including the software-integrity evidence section updated machines fail first — and the old-vs-new delta, item by item.

3

Gap list + DoC fields

Ranked gaps with remediations, and the Annex V declaration-of-conformity structure ready to complete — rewritten for the Regulation, never restamped.

Article 25 pathway reasoning Annex I Part A / Part B split Corpus version on every page Regenerated free for 12 months

Founding pilot

Two ways in, prices on the page

Onboarding a small founding cohort by email, one company at a time.

One-off

Readiness pack

€590
founding-cohort pricing
  • Pathway verdicts for your machine list
  • Annex IV technical-file skeleton
  • Delta report + ranked gap list
  • Regenerated free for 12 months
Request a slot by email Or pay by card now — €590

Kept current

Maintained

€990/yr
as guidance and standards land
  • Everything in the pack
  • Regenerated as guidance and standards land
  • New machines added as you build them
  • Change alerts: what moved, and why
Request by email

Pilot guarantee: if your pack doesn't surface at least three gaps specific to your machines, you don't pay. The alternatives today are £50 generic CE templates still written for the old Directive, or a five-figure consultancy engagement with a waiting list — there is no other productized pack for Regulation 2023/1230 that we could find, and we looked hard.

Card payments are taken by Stripe on its secure checkout page — this site stores no payment details. Pay by card now (€590, refunded in full if the pack does not surface at least three gaps specific to your company), or by invoice after scoping with nothing owed until your order is confirmed in writing. Our solicitor's pre-launch review is ongoing; its wording lands on these pages the day it arrives.

Honest limits

Read this before requesting a slot

Stated here rather than in the small print, because in machinery safety an overclaim is not marketing — it is a hazard.

MachineryReady produces internal readiness documentation: file skeletons, delta reports, gap lists, a DoC structure. It is not legal advice and not a conformity assessment.

Conformity is established only by the applicable procedure.

It is not a CE marking. Where Annex I requires a notified body, no document pack substitutes for one — and the pack flags when that is likely.

Notified-body capacity is a scheduling constraint.

What we build is the scoping and the structure — your engineers keep engineering; they stop spending a month decoding the Regulation.

Hours of scoping instead of a month of decoding.